Sign in or RegisterBefore applying to connect
Because multi-residential unit developments can be complex, we recommend submitting a Pre-Lodgement Application via the Development Portal before starting the connection application.
This service saves you time by providing upfront advice that helps you understand what’s involved in applying to connect, and what supporting information is required to lodge a successful application.
Submit a Pre-Lodgement Application
Need to discuss your development?
Pre-Lodgement meetings are available if you would like to discuss your development prior to the submission of a Pre-Lodgement or Connection Application. These meetings are facilitated by our Development Services team. You can request a Pre-Lodgement Meeting via the Development Portal.
View our pricing, fees and charges to see the applicable fees for these services.
What to submit with your Connection Application
You will need:
- the land owner’s consent
- consent from owners of any nearby property affected by the proposed work, e.g. if access is required
- the Lot and Plan Number of your property
- a street plan that adequately locates the property
- construction plans showing gross floor area
- hydraulic plans – including details of water supply and sewerage connection, and sub meters (if applicable)
- a document detailing the nature of your development.
How a certifier can help
A Registered Certifier helps make the approvals process easier by preparing, assessing and submitting your applications for Unitywater’s approval.
For connection applications they help with:
- Preparing and submitting your Connection Application
- Identifying whether the existing water and sewer network can accommodate your development, or if additional infrastructure is required
- Providing design advice on Unitywater-approved allowable servicing solutions
- Assessing firefighting requirements
- Identifying sub-metering requirements
- Drafting Certificates of Completion for Unitywater’s approval.
If network works are required, they help with:
- Preparing and submitting your Network Works Application
- Conducting pre-start meetings on our behalf
- Completing final inspections
- Conducting final testing of construction works
- Arranging live connections
- Managing handover of network infrastructure to Unitywater.
Our Accreditation Register helps you find the right Registered Certifier to assist with your application.
We will then assess the Certification Packages and issue Decision Notices.
We only accept connection applications prepared by a Registered Certifier.
5 phases of connecting to our network
Connecting a multi-residential unit development to our network involves up to five distinct approval phases. If your project does not require alterations or extensions to our water or sewer mains (network works), the Construction and Final Acceptance phases do not apply.
A Registered Certifier assists you with each phase of the approvals process.
In this phase you will be planning your development, preparing plans and submitting documents to council and Unitywater for approval.
We recommend submitting a Pre-Lodgement Application via the Development Portal before starting a connection application.
This service saves you time by providing upfront advice that helps you understand what’s involved in applying to connect, and what supporting information is required to lodge a successful application.
What you need
- Pre-Lodgement advice from council, if received
- Approvals from council, if received
- Development plans/designs.
The first step is to submit the documentation and plans for your Connection Application. If your development requires extensions or modifications to the existing mains, you also need to submit a subsequent Networks Works Application. All development applications are submitted via the Development Portal.
What you need:
- Approvals from council, if received
- Development plans/designs.
This phase only applies to developments that involve you or your sub-contractors making extensions or modifications to our water or sewer mains.
The construction phase always starts with an onsite pre-start meeting between you or your consulting engineer, your contractor (or principal contractor and sub-contractor) and a Registered Certifier, who acts on Unitywater’s behalf.
A Major Connection Certifier and a Construction Certifier work together during this phase to prevent delays by ensuring all work is carried out to Unitywater’s satisfaction.
What you need:
- Approvals from council and Unitywater
- A contractor to complete the works.
All developments involve a live connection phase. In this phase you pay your Infrastructure Charges Notice (ICN) and receive a Certificate of Completion.
Live connections to our network are carried out exclusively by our Private Works team. These industry specialists help guarantee the safety of our water supply by ensuring there is no risk of contamination during the connection process.
If your development did not involve network works, then the connection phase proceeds as below.
This is undertaken by our Private Works team.
And submits to Unitywater for approval.
What you need:
- Completion of contracted works.
All developments involve a live connection phase. In this phase you pay your Infrastructure Charges Notice (ICN) and receive a Certificate of Completion.
Developments that involve upgrades or extensions to our mains (network works), go through an On Maintenance phase to ensure infrastructure is operating correctly. This proceeds as follows:
This is returned after your works have successfully completed the defect liability period.
If defects are found, these need to be rectified and the work re-inspected.
This is undertaken by our Private Works team.
This is usually a 12-month period.
After receiving the Certificate of Completion and the network is live, you remain financially liable for any defects identified until the defect liability period ends and the works pass an Off Maintenance inspection.
What you need:
- Payment of Infrastructure Charges
- Payment of live connection fee.
This phase involves the Final Acceptance of the network assets and their maintenance to Unitywater. It only applies if network works were required.
You initiate this by submitting an Off Maintenance Application to Unitywater when the On Maintenance period has ended.
Once the works have been inspected to the satisfaction of a Construction Certifier, we return your bond and your development is complete.
If defects are detected, they need to be rectified and re-inspected before Final Acceptance is finalised.
What you need:
- Inspection by a Construction Certifier
- Your certifier submits an Off Maintenance Application.
Important note about sub-metering of existing buildings and complexes
- It is possible to retrofit individual water meters to existing buildings or unit complexes.
- The body corporate must approve and apply for this retrofit on behalf of the owners. A copy of the body corporate minutes approving the retrofit of sub-meters must accompany the application.
- Retrofitting sub-meters will be at the cost of the owners or the body corporate.
- Unitywater advises that a private plumbing contractor should be consulted in regard to the feasibility of retrofitting sub-meters to an existing building. There may be a cost associated with the plumbing installation/augmentation that will need consideration.
- Once you are ready to proceed, your plumber can find all the information they need in the sub-metering for plumbers section.