Project Summary

As part of our commitment to long-term sustainable water supply in our region, Unitywater has built the Wamuran Irrigation Scheme.

This recycled water scheme will provide year-round water security for a number of Wamuran farmers while sustainably managing wastewater from the Caboolture South Sewage Treatment Plant (STP).

The Scheme will not only supply high quality recycled water to growers in our region but will also help us meet our pledge to reach net zero nutrients to waterways by 2040.

What next?

We will be kicking off a rigorous testing and verification process to make sure everything is working as planned; from the chemical dosing system and the ultraviolet disinfection treatment process right through to testing the pumps and pipes. This will demonstrate that the Scheme works, treating effluent to a Class A standard suitable for use on minimally processed food crops.

The results of the testing and verification will form part of the Recycled Water Management Plan (RWMP) we will submit to the Department of Regional Development, Manufacturing and Water and Queensland Health in mid-2024. Whilst the Department is reviewing the RWMP, we can distribute the Class A recycled water to a turf farm then, pending approval of the RWMP, we will start sending water to minimally processed food crops in late 2024.

Wamuran timeline

Completed
Design and feasibility assessment

Assessing scheme efficiency and designing for current and future demand targets

Completed
Construction phase

Construction is now complete

Early 24
Verification and validation 

Following scheme construction, verify and validate reliability and quality of the recycled water prior to use on food crops. 

Mid - late 2024
Operation and maintenance
Scheme operation and maintenance commences for foundation participants and assessed for future expansion

 
The Wamuran Irrigation Scheme will divert Class A recycled water from the Caboolture South Sewage Treatment Plant to farms, giving those participating in the Scheme greater certainty for crop planting and enabling them to expand their operations.

In its first stages, the Scheme will deliver about 2.6 gigalitres of recycled water per year – the equivalent of 1051 Olympic swimming pools – to a number of farming operations in the region producing raspberries, strawberries, pineapples, avocados and turf. As the population grows and the supply of recycled water increases, more will be distributed and more growers from the region will be able to access the Scheme.

The Class A recycled water produced by the Scheme will go through a rigorous treatment, disinfection and testing process before being used to irrigate crops.

Unitywater is working closely with Queensland Health and the Department of Regional Development, Manufacturing and Water to ensure it complies with all state and national public health and food safety regulations as the Scheme progresses.

Print our downloadable factsheet for more information about how the Scheme will work. 

Wamuran scheme benefits


Expected population increases in the Moreton Bay region will create additional loads through Unitywater’s sewage treatment plants and higher effluent volumes following treatment.

Unitywater identified a unique opportunity to treat recycled water at the Caboolture South STP to Class A standard, then supply the water to farmers who currently rely on their own dams or local creeks to irrigate their crops.

In 2016, Unitywater commissioned a survey to gauge interest from agribusinesses in the Wamuran area about the use of recycled water on food and turf crops, which was met with a lot of interest. A number of foundation customers were identified using a weighted multi-criteria process that included their location and projected recycled water demand. We also considered a diverse range of crops, with an even mix of seasonal and day/night water requirements, so the Scheme could handle peak demands. Crops in the first stage of the Scheme include raspberries, strawberries, pineapples, avocados and turf.

The Scheme was constructed during 2022 and 2023 and is due to be operational in late 2024.

Benefits from the Scheme include providing a high quality, secure water supply for growers and reducing effluent and nutrient volumes being discharged into the Caboolture River. As more water becomes available from the Caboolture South STP, the Scheme will expand to service more local growers.


Wastewater from the Caboolture South STP will be treated in a disinfection facility before it is transferred via a 10km pipeline to Moodlu Quarry, where it will pass through a water quality management facility.

Moodlu Quarry will be used for mid-stream balancing storage to ensure that surplus water is held to meet peak seasonal crop demand.

Moodlu Quarry is critical to the success of the Scheme and from late February 2022, will become an active construction zone with strict site access protocols in place.

In Stage 1, water will be delivered to farms from the Moodlu Quarry pump station through another 12km pipeline to safely irrigate turf and food crops.

How the Wamuran Irrigation Scheme will operate:

 

Wamuran Irrigation Scheme - Stage 1


Phase 1: Design and feasibility assessment

March 2020 – December 2021

Investigations undertaken in this phase included the way in which we treat the water, the design of the pipeline and associated infrastructure and how the recycled water could be used by farms for irrigation.

Early design and feasibility investigations are complete and the scheme was approved by the Unitywater Board in December 2021. 

Phase 2: Construction
Early 2022 – Late 2023

Construction of the distribution pipeline was completed by the Wamuran Irrigation Scheme Joint Venture in late 2023. Construction of new infrastructure at the Caboolture South Recycled Water Treatment Plant is expected to be finished by the end of 2023 and commissioned in early 2024.

Phase 3: Verification and validation
Early - Mid 2024

Following scheme construction, verify and validate reliability and quality of the recycled water prior to use on food crops.

This information will be used to finalise the Recycled Water Management Plan for the Scheme and seek approval from the Department of Regional Development, Manufacturing and Water and Queensland Health to supply recycled water to all Scheme Participants. 

Phase 4: Operate and maintain
Mid - Late 2024 onwards

After the infrastructure is commissioned, Unitywater will operate and maintain the Scheme. This will include distributing the recycled water from the treatment plant to end users, undertaking monitoring for compliance, regulatory reporting and ongoing liaison with farmers in the region to manage supply to both existing and new scheme users.